Metrolinx: Looking north at the accessible parking roof trusses and the link bridge.
Metrolinx: Installation of Silva Cells (an underground framework preserving lightly compacted soil that supports tree growth and absorbs rain runoff water) by Bayly Street.
Metrolinx: Complete floor slab concrete pour on Level 1.
Metrolinx: Link bridge connection to the pedestrian bridge over Highway 401.
Metrolinx: Looking west at the south side of the parking structure.
Metrolinx: White membrane roof over the the electrical and communications rooms.
Metrolinx: White membrane roof over the electrical and communications rooms.