Metrolinx: Support beams for a canopy on the west side of the structure.
Metrolinx: Support beams for a canopy on the north side of the structure.
Metrolinx: Support beams for a canopy on the north side of the parking structure; the canopy will wrap around the structure on the north, west and south sides.
Metrolinx: Looking out of the parking structure toward the pedestrian bridge over Highway 401.
Metrolinx: The link bridge steel beams will support a monorail system for window cleaning equipment.
Metrolinx: One of the steel beams being lowered into position for welders to attach to the rest of the frame that will make up the covered part of the link bridge.
Metrolinx: One of the steel beams being lowered into position for welders to attach to the rest of the frame that will make up the covered part of the link bridge.
Metrolinx: One of the steel beams being lowered into position for welders to attach to the rest of the frame that will make up the covered part of the link bridge.
Metrolinx: The link bridge extends over the bus loop.
Metrolinx: The link bridge will connect the parking structure with the pedestrian bridge over Highway 401.
Metrolinx: Future entrance to the elevators on the ground floor of the parking structure.
Metrolinx: Looking up the elevator shaft.
Metrolinx: Exterior view of the elevator shaft and staircase.
Metrolinx: Final grading of ground floor of the parking structure.
Metrolinx: Final grading of ground floor of the parking structure.
Metrolinx: An expansion joint will be installed between two precast concrete components.
Metrolinx: Raw precast floor components waiting for the top coat to be poured.
Metrolinx: Fresh concrete curing under moist burlap.
Metrolinx: Fresh concrete being poured on the driving surface of the parking structure.
Metrolinx: Fresh concrete being delivered inside the structure to be poured as the top coat of the driving surfaces.
Metrolinx: Fresh concrete being delivered inside the structure to be poured as the top coat of the driving surfaces.
Metrolinx: The aluminum framing will support glass cladding around the structure.
Metrolinx: The aluminum framing will support glass cladding around the structure.
Metrolinx: The bus loop remains busy during construction.
Metrolinx: The bases of the piers for the canopy between the parking structure and station building are in place.
Metrolinx: The canopy will provide a covered connection between the new parking structure and the station building.
Metrolinx: The canopy will provide covered access to the new parking structure.
Metrolinx: The canopy will provide covered access to the station building.