Metrolinx: The bus loop remains busy while the work is underway above it.
Metrolinx: Looking north from Bayly Street.
Metrolinx: Finishing the surface of the concete floor.
Metrolinx: Future connection with the existing Hwy 401 pedestrian bridge.
Metrolinx: Ready to pour more concrete and join the bridge with the new parking structure.
Metrolinx: Curing the concrete.
Metrolinx: Pumping concrete inside the formwork for the cast-in-place concrete floor.
Metrolinx: Installing and tying rebar inside the formwork for the cast-in-place concrete floor.
Metrolinx: Installing and tying rebar inside the formwork for the cast-in-place concrete floor.
Metrolinx: Looking east at the future elevator shaft and staircase, and where the bridge will link with the parking structure.
Metrolinx: Pickering GO Station Link Bridge; May 2013
Metrolinx: Extending the formwork for the cast-in-place concrete floor for the link bridge.
Metrolinx: The bus loop remains busy while the work is underway above it.
Metrolinx: Extending the formwork for the cast-in-place concrete floor for the link bridge.
Metrolinx: Extending the formwork for the cast-in-place concrete floor for the link bridge.
Metrolinx: Extending the formwork for the cast-in-place concrete floor for the link bridge.
Metrolinx: A close-up of one of the piers that will support the bridge.
Metrolinx: Extending the formwork for the cast-in-place concrete floor.
Metrolinx: Scaffolding is set up to further extend the formwork for the link bridge.