Metrolinx: Looking north. From the just over the overpass at the 409 off ramp to Viscount Road. (March 2013)
Metrolinx: Laying form work for deck. The construction crew lays the form work as preparation for the Spur deck. (March 2013)
Metrolinx: Keeping an eye on the final destination. The Spur winds its way towards Terminal 1. (March 2013)
Metrolinx: Construction crew braves bitter wind to be ready for spring work. (March 2013)
Metrolinx: View from Pier #35, which is approximately halfway to Terminal 1. (March 2013)
Metrolinx: The Spur will stretch 3km. From GO's Kitchener line to Terminal 1. (March 2013)
Metrolinx: Brackets support the form work. (March 2013)
Metrolinx: Pier #59. 70 piers are needed to connect GO's Kitchener LIne to Terminal 1. (March 2013)
Metrolinx: A sky-high view from pier #60. (March 2013)
Metrolinx: Looking back at what's been built. (March 2013)
Metrolinx: The Alt Hotel near Viscount Road. (March 2013)
Metrolinx: A reverse look. (March 2013)
Metrolinx: At 60 feet, these aren't the highest piers yet. (March 2013)