KCWTD: 1903_ts1-site-prep
KCWTD: 1903_ts2-Dewatering-system
KCWTD: 1903_ts3-ips-site
KCWTD: 1903_ts4-secant-piling
KCWTD: 1903_ts5-60in-pipe
KCWTD: 1903_ts6-reg-structure
KCWTD: 1903_ts7-concrete-slab
KCWTD: 1903_ts8-concrete-slab
KCWTD: 1903_ts9-supporting-structures
KCWTD: 1903_ts10-instal-steel-rebar
KCWTD: 1905_ts1-Erecting-aluma-system-for-slab-wall-beam-placement
KCWTD: 1905_ts2-Sheet-pile-placement
KCWTD: 1905_ts3-Set-both-24-inch-vent-pipes
KCWTD: 1905_ts4-Concrete-slab-placement
KCWTD: 1905_ts5-Erecting-aluma-system-with-deck-for-upper-slab-placement
KCWTD: 1905_ts6-Facing-west-of-site
KCWTD: 1905_ts7-Wall-reinforcement-install
KCWTD: 1908-ts8-Concrete-slab-placement
KCWTD: 1908-ts7-rebar-and-wooden-formwork
KCWTD: 1908-ts6-crews-install-rebar
KCWTD: 1908-ts5-Carpenters-forming-structural-wall
KCWTD: 1908-ts3-CDF-encasement-of-60''EFF-pipe
KCWTD: 1908-ts2-Conc-slab-placement-in-UV-Disinfection-building
KCWTD: 1908-ts1-caffoldling-built-in-secant-shaft-of-Pump-Station
KCWTD: 1001_ts1
KCWTD: 1001_ts3
KCWTD: 1001_ts2
KCWTD: 1001_ts5
KCWTD: 1911_ts4-EQ-basin-drop-structure-formed
KCWTD: 1911_ts3-Reinforcement-at-el.-90-slab&-beam-placement-in-300Bldg