KR Dietz: The Table
KR Dietz: First pieces
KR Dietz: The Tent
KR Dietz: Butt Joints
KR Dietz: The Hull pieces...
KR Dietz: Stitches
KR Dietz: The hull, mostly.
KR Dietz: Sanding.
KR Dietz: The sanded hull
KR Dietz: Primed
KR Dietz: Glass sheet
KR Dietz: Glassed.
KR Dietz: Finished Hull
KR Dietz: Finished hull
KR Dietz: Deck panels
KR Dietz: Deck in the works
KR Dietz: Back Deck
KR Dietz: Aligned and tight.
KR Dietz: Deck
KR Dietz: Separated
KR Dietz: Footpeg studs.
KR Dietz: Footped rail installed
KR Dietz: Glassed hull. Footpeg located.
KR Dietz: Starting the toggle hole install
KR Dietz: Drilling to 1"
KR Dietz: Toggle Hole
KR Dietz: Trimming
KR Dietz: Cut Flush
KR Dietz: End Pour
KR Dietz: Hull Taped on