jmj2001: One Engineer-in-charge does shift hand-over to another
jmj2001: IMG_0025.jpg
jmj2001: Optics measurement and correction team
jmj2001: First test collisions
jmj2001: Bleary-eyed team after achieving first test collisions after a very long night
jmj2001: Optimising first collisions
jmj2001: Collimation team members
jmj2001: First injected trains
jmj2001: Preparing first stable beams
jmj2001: The beams themselves
jmj2001: Measuring emittances
jmj2001: 10 bunches in each beam
jmj2001: Preparing for 250 bunches colliding
jmj2001: First stable beams
jmj2001: IMG_0056.jpg
jmj2001: IMG_0057.jpg
jmj2001: IMG_0058.jpg
jmj2001: IMG_0059.jpg
jmj2001: Stable Beams with 250 bunches
jmj2001: IMG_0067.jpg
jmj2001: IMG_0068.jpg
jmj2001: IMG_0070.jpg
jmj2001: IMG_0071.jpg
jmj2001: IMG_0072.jpg
jmj2001: IMG_0075.jpg
jmj2001: IMG_0076.jpg
jmj2001: IMG_0079.jpg
jmj2001: IMG_0080.jpg
jmj2001: IMG_0081.jpg
jmj2001: IMG_0102.jpg