jbmg40: Raw materials
jbmg40: Raw materials
jbmg40: Planning the layout
jbmg40: Planning the layout
jbmg40: Planning the layout
jbmg40: Sam test driving the excavator
jbmg40: Sam test driving the excavator
jbmg40: A large hole :O
jbmg40: A large hole :O
jbmg40: The errant tumbled blocks
jbmg40: Halfway through our second skip!
jbmg40: Pete, with a giant lump of concrete
jbmg40: Sam in a very big hole
jbmg40: The second patio slab area for the arbor
jbmg40: Horrible plants grubbed out
jbmg40: End of day 2
jbmg40: End of day 2
jbmg40: Another skip nearly full!
jbmg40: Comedy shuttering for the concrete
jbmg40: Dave popped by to lend a hand :)
jbmg40: Dave leaves his mark.
jbmg40: Concreting in progress
jbmg40: Nicki helped by undoing one screw. :|
jbmg40: Sub base material 75% there
jbmg40: Stripping the turf for the gravelled sections
jbmg40: Shuttering for second lot of concrete
jbmg40: Concrete edging nearly set
jbmg40: Sam
jbmg40: Main area levelled to top of sub-base
jbmg40: Edge bricks laid out roughly