inveneo: Ecole Evangelique d'Haiti de Robillard_building2
inveneo: Preparing for the lab The wall needs to be built up to the roof
inveneo: Preparing for the lab Bars are needed on the windows
inveneo: Ready for the lab bars are on the windows
inveneo: Secure windows
inveneo: Batteries, inverter and charge controller
inveneo: Entrance to the director's office and the lab
inveneo: BATI Germinal finishes the lab install
inveneo: The lab is ready for use
inveneo: Ecole Evangelique d'Haiti de Robillard
inveneo: 2012_11_Ecole Evangelique_d'Haiti_de_Robillard_panels_inverter
inveneo: Solar panels are installed on poles at this school
inveneo: Solar panels are installed on poles a(2)
inveneo: Driver Ronald got us safely to the school during a major storm when many roads were flooded