id29design: A big pile of antique cast-iron treads fresh from the powdercoater
id29design: Doug finds the center
id29design: Drill a hole
id29design: Drop a plumb bob for the pole location
id29design: Scribing a 54" circle on the floor above w/a sharpie
id29design: Start cutting
id29design: Fabricating a handle so the pieces we cut won't drop
id29design: Getting there, my forearms hurt
id29design: Doug sands the finished opening, careful not to fall in.
id29design: Calling in the pros to deliver the 15' center pipe.
id29design: Ready to attach the 'hockey puck' to hold the pole in place.
id29design: Preparing the 'hockey puck' to accept the center pipe
id29design: The 'hockey puck' lagged in the floor
id29design: Jake measuring the first 3 risers. Once the spindles are bolted thru the treads, they are locked tight.
id29design: Lining up the lowered tread.
id29design: Once the center pole is set, treads must be lowered from above
id29design: Looking good from above, kind of like a snail shell interior.
id29design: The handrail was delivered in a coil, like a big slinky.
id29design: Bleech unrolling the aluminum hand rail
id29design: Spindles. The long threaded one is #1 and goes thru the floor.
id29design: Treads locked together via the new spindles fabricated by Bleech at Cardish Machine Works.
id29design: All treads, spindles and landing plate in place, ready for handrail install.
id29design: Handrail getting placed.
id29design: Attaching the last spindle.
id29design: Floor mounted gate spindles lagged into the floor, top railing partially installed.
id29design: Almost complete, just some self-tapping screws in the top rail away.
id29design: Doug trims the top of the pipe.
id29design: Grinding.
id29design: Ice cream makes the meal!