Nigel Valentine: 1 attaching the crane
Nigel Valentine: 2 placing the bar
Nigel Valentine: 3 JCB driver
Nigel Valentine: 4 getting ready to lift
Nigel Valentine: 5 lifted from rest
Nigel Valentine: 6 watching carefully
Nigel Valentine: 7 watching the lift
Nigel Valentine: 8 Guiding the rope
Nigel Valentine: 9 Pointing at the cameraman
Nigel Valentine: 10 moving up the platform
Nigel Valentine: 11 consist in place
Nigel Valentine: 12 train in situ
Nigel Valentine: 13 caopy starts to go up
Nigel Valentine: 14 canopy moving over
Nigel Valentine: 15 moving over v2
Nigel Valentine: 16 supervisor
Nigel Valentine: 17 up on the roof
Nigel Valentine: 18 twin canopies start to appear
Nigel Valentine: 19 guiding into place on the roof
Nigel Valentine: 20 fotters
Nigel Valentine: 21 into position on the trackside roof
Nigel Valentine: 22 all lifted on
Nigel Valentine: 23 from platform 3
Nigel Valentine: 24 time to reflect on the day