● port
foto
lio ●
061-14 The Anderton Boat Lift (going down…) by hilofoz
Photos
Albums
|
Groups
Favourites
|
Subscriptions
Contacts
|
Recommendations
Do you miss your pictures? Click here.
Do you have a flickr account?
Sign in!
©
hilofoz
:
Leaving for the Anderton Lift
©
hilofoz
:
48 hour moorings by Check Office Bridge
©
hilofoz
:
Willow on the Holding Moorings
©
hilofoz
:
Waiting at the Holding Moorings
©
hilofoz
:
Two boats have come up the lift and are crossing the aqueduct and pound
©
hilofoz
:
Turning to enter the pound by Bridge 199A
©
hilofoz
:
Beneath the footbridge, entering the pound
©
hilofoz
:
Being the larger boat, Willow enters first and crosses the aqueduct
©
hilofoz
:
The lockie guides us through
©
hilofoz
:
We stop untill waiting for the guillotine gates to lift
©
hilofoz
:
Sun glares on a very bright morning, looking up at the footbridges
©
hilofoz
:
The River Weaver and Anderton Lift grounds down below
©
hilofoz
:
Looking back at the pound as we cross the aqueduct
©
hilofoz
:
Stopping before the caisson gates
©
hilofoz
:
The gates begin to lift
©
hilofoz
:
Once the gate is lifted, we can now enter the caisson
©
hilofoz
:
The Anderton Boat lift Maze down below, made from old counterweights
©
hilofoz
:
Walkway surrounding the caisson at the top level
©
hilofoz
:
The neighbouring boat secures the line
©
hilofoz
:
Looking up at the structure and huge riveted beams
©
hilofoz
:
Rivets and columns support the structure
©
hilofoz
:
These were the original gears, but no longer in operation
©
hilofoz
:
Looking back at the skipper in the Caisson
©
hilofoz
:
Skppers eye view, looking back at the aqueduct bridge
©
hilofoz
:
Side by side and stem to stern, a cabin cruiser also joins us for the fun
©
hilofoz
:
Down below, the River Weaver rounds the bend
©
hilofoz
:
Our lockies make sure we are secure before descending
©
hilofoz
:
Looking south at to the saltworks
©
hilofoz
:
A narrowboat passes gargantuan salt plant over the Weaver
©
hilofoz
:
Air Liquide tanks by the salt works
Next Page