Heights Library: IMG_0150
Heights Library: IMG_0149
Heights Library: IMG_0145
Heights Library: IMG_0143
Heights Library: IMG_0142
Heights Library: IMG_0139
Heights Library: 11-21-05 AC west bridge truss arrives
Heights Library: 11-22-05 LIB abutment buttresses installed
Heights Library: Main Library
Heights Library: Main Library
Heights Library: 11-21-05 AC flip truss step 2
Heights Library: 10-11-05 AC bridge ramp from the second floor
Heights Library: 11-21-05 AC flip truss step 3
Heights Library: 11-21-05 AC east connection points on truss
Heights Library: 11-21-05 AC crane for bridge truss delivery
Heights Library: 11-21-05 AC flip truss step 1
Heights Library: 11-21-05 AC interior truss view
Heights Library: 10-11-05 LIB bridge abutments
Heights Library: 10-11-05 AC View across future bridge span
Heights Library: 11-21-05 AC Comm Steel Truck Driver
Heights Library: 11-21-05 AC setting truss support steel
Heights Library: 11-21-05 AC lift up truss so truck can leave
Heights Library: 11-21-05 AC truss installation begins
Heights Library: 11-21-05 AC flop truss step 4
Heights Library: 11-21-05 AC Supports for the back of the bridge truss
Heights Library: 11-21-05 AC truss east connection points
Heights Library: 11-21-05 AC lifting truss into place
Heights Library: 11-21-05 AC view across bridge span from Lib roof
Heights Library: 11-21-05 AC truss set in place west
Heights Library: Main Library