Gypsy NZ: 1 West system command centre
Gypsy NZ: 3 framing continues
Gypsy NZ: 2 Bulk heads (BHD) framed and ready for coating
Gypsy NZ: 4 cutting and framing of BHDs
Gypsy NZ: 5 Beam material scarfed
Gypsy NZ: 6 BHD alignment port
Gypsy NZ: 7 BHD alignment starboard
Gypsy NZ: 8 finally standing
Gypsy NZ: 18 black poly to keep bird dung off
Gypsy NZ: 17 bow closed in and faired
Gypsy NZ: 16 Nose cones shaped and faired
Gypsy NZ: 24 hulls first turned over and aligned
Gypsy NZ: 19 starboard hull aligned and bulkhead cut
Gypsy NZ: 18 hull aligned and bulkheads cut
Gypsy NZ: 23 guick look inside port
Gypsy NZ: 22 quick look inside