gordonr:
floor done
gordonr:
plastic over the tile-less floor
gordonr:
duct tape zipper
gordonr:
haz-bry
gordonr:
suiting up
gordonr:
wall half-done
gordonr:
gyproc
gordonr:
end of the evening basement
gordonr:
ceiling satisfaction
gordonr:
all ceiling, all the time
gordonr:
to be done kitchen
gordonr:
basement
gordonr:
basement bathroom
gordonr:
stairs up to the main floor
gordonr:
tools of the trade
gordonr:
sweaty & tired
gordonr:
covered floor
gordonr:
number face man
gordonr:
serious business
gordonr:
Ian goes to town
gordonr:
Ian
gordonr:
the happy owners
gordonr:
the downstairs bathroom
gordonr:
and now its gone
gordonr:
kim
gordonr:
wall with t-minus 3 minutes to live
gordonr:
piles of gyprock
gordonr:
gyprock
gordonr:
taking out tile
gordonr:
found in the walls