theycallmebrant:
Tom Grinding the Floor
theycallmebrant:
Cleaned Meeting Space
theycallmebrant:
Cleaned Meeting Space
theycallmebrant:
Transformer Guts
theycallmebrant:
Transformer Guts: Taps
theycallmebrant:
Transformer Guts: Windings
theycallmebrant:
Transformer Guts: Bus Bar
theycallmebrant:
225 kVA Transformer
theycallmebrant:
We got a dumpster! Yay!
theycallmebrant:
To Do List
theycallmebrant:
Grinding Almost Complete
theycallmebrant:
Last access flooring and transformer removed
theycallmebrant:
Wall in need of patching
theycallmebrant:
Future Overhead Door Location
theycallmebrant:
Replacing Vault 12's Light Switch
theycallmebrant:
Fixed The Light!
theycallmebrant:
Grinding The Edges
theycallmebrant:
Spreading Epoxy
theycallmebrant:
Spreading Epoxy
theycallmebrant:
Overhead Door and Fan Opening
theycallmebrant:
Spreading Epoxy
theycallmebrant:
Spreading Epoxy
theycallmebrant:
Grinding The Edges
theycallmebrant:
Grinding The Edges
theycallmebrant:
Spreading Epoxy
theycallmebrant:
Move In Progress
theycallmebrant:
East Room, Second Coat
theycallmebrant:
East Room, Second Coat
theycallmebrant:
Partly Mopped Hallway
theycallmebrant:
Vault 17 Clean Floor