Fusion for Energy:
Walter Tosto technicians performing checks on Europe's sector 2 poloidal segment 3 of the ITER Vacuum Vessel, Walter Tosto, Italy, May 2022. Copyright: F4E
Fusion for Energy:
Technician welding Europe's sector 4 of the ITER Vacuum Vessel in final assembly, Walter Tosto, Italy, May 2022. Copyright: F4E
Fusion for Energy:
Final assembly of Europe's sector 4 of the ITER Vacuum Vessel, Walter Tosto, Italy, May 2022. Copyright: F4E
Fusion for Energy:
Technicians installing shielding blocks on Europe's Sector 3 poloidal segment 3 of the ITER Vacuum Vessel, Walter Tosto, Italy, May 2022. Coyright:F4E Load of component: 103 tonnes
Fusion for Energy:
Walter Tosto technician performing inspection on Europe's Sector 9 poloidal segment 2 of the ITER Vacuum Vessel with F4E representative, Walter Tosto, Italy, May 2022. Copyright: F4E. Load of component: 85 tonnes.
Fusion for Energy:
Walter Tosto technician performing inspection on Europe's Sector 9 poloidal segment 2 of the ITER Vacuum Vessel, Walter Tosto, Italy, May 2022. Copyright: F4E
Fusion for Energy:
F4E representative performing inspection at Europe's Sector 5 of ITER Vacuum Vessel, Mangiarotti, Italy, May 2022. Copyright: F4E
Fusion for Energy:
Assembly under completion of Europe's Sector 5 of ITER Vacuum Vessel, Mangiarotti, Italy, May 2022 Copyright: F4E
Fusion for Energy:
Mangiarotti technician performing inspection at Europe's Sector 5 of ITER Vacuum Vessel, Mangiarotti, Italy, May 2022. Copyright: F4E
Fusion for Energy:
Preparing Europe's ITER Vacuum Vessel Sector 3, poloidal segment 2 for Radiographic Testing (RT) in the bunker, Belleli, Italy, May 2022. Copyright: F4E
Fusion for Energy:
Belleli technician performing cleaning test on Europe's ITER Sector 2, poloidal segment 2, Belleli, Italy, May 2022. Copyright: F4E
Fusion for Energy:
Preparing the outer shell welding for poloidal segment 2 of Europe's ITER Vacuum Vessel Sector 3, Belleli, Italy, May 2022. Copyright: F4E