C.Elston: The old 'green' area.
C.Elston: Side of the main building.
C.Elston: Main incoming electrical supply
C.Elston: P1010956
C.Elston: Redundant switch cabinet.
C.Elston: Redundant switches
C.Elston: Precipitator control panel
C.Elston: Fuses.
C.Elston: Workshop area with overhead crane.
C.Elston: Stairs
C.Elston: Mineral insulated cable.
C.Elston: Looking up
C.Elston: Control room.
C.Elston: Control room
C.Elston: Incinerator controls
C.Elston: Incinerator diagram.
C.Elston: Isolators and meters
C.Elston: Control knobs
C.Elston: Control knobs
C.Elston: Indicators
C.Elston: Indicators
C.Elston: Draught gauges
C.Elston: Indicator lights
C.Elston: Baling press controls
C.Elston: Clinker conveyor
C.Elston: Fly ash conveyor
C.Elston: Isolate before removing guard
C.Elston: Inside the main incinerator
C.Elston: Inside the main incinerator
C.Elston: Inside the main incinerator