Eisbrener: The road into the project no construction.
Eisbrener: Oct 2004 Home lot
Eisbrener: Home lot and imagination
Eisbrener: Floor supported for cement.
Eisbrener: FLat ground cut down about a story.
Eisbrener: Guard Parrot
Eisbrener: A drainage pipe runs along the edge
Eisbrener: A parrot guards the place!
Eisbrener: Looking to the north back yard.
Eisbrener: The model began a month earlier.
Eisbrener: Foundation of unit below us.
Eisbrener: Ceiling getting ready for cement.
Eisbrener: The pool is visible to the right.
Eisbrener: Foundation ready for cement.
Eisbrener: The 'pool' area is still visible.
Eisbrener: The unit below ours.
Eisbrener: The unit below on second floor mode
Eisbrener: Back yard looking to model
Eisbrener: The view looking up from the lot.
Eisbrener: view of the valley below
Eisbrener: Second story begun.
Eisbrener: Taking shape
Eisbrener: Ready to pour the flow on 2nd floor
Eisbrener: View from second floor
Eisbrener: The unit below walls going up.
Eisbrener: What a mess!
Eisbrener: Forms down from floor above.
Eisbrener: Our future home from the model
Eisbrener: Model is taking shape