ds23pallas: Right rain gutters before
ds23pallas: Right rain gutters during
ds23pallas: Replacement boot seal holder in place
ds23pallas: Rust in the rear panel
ds23pallas: Remnants of the old rear seal holder removed in preparation for repairs to the rear panel
ds23pallas: Rusty metal cut out
ds23pallas: Repair section being butt welded in place
ds23pallas: More rusty metal removed
ds23pallas: Rear repairs nearing completion
ds23pallas: All of the rust in the rear has now been repaired
ds23pallas: Next the rear seal holder is replaced
ds23pallas: The rear solder holder is plug welded in place
ds23pallas: The rear aperture is now repaired and ready to be painted
ds23pallas: The rear left needed a small repair
ds23pallas: The rear left completely stripped down and ready for another rebuild
ds23pallas: Out with the rear screen
ds23pallas: The next repair is the base of the c-pillar
ds23pallas: I cut the outer panel out to gain access to the inner panel
ds23pallas: The first repair section added to the inner c-pillar
ds23pallas: Here is the rearmost repair section for the c-pillar in place.
ds23pallas: Flange section cut out
ds23pallas: Flange area repaired
ds23pallas: Upper c-pillar repaired
ds23pallas: Further flange repairs
ds23pallas: The same area after smoothing and priming.
ds23pallas: Another section of wheelarch flange tacked in position
ds23pallas: The rearmost piece of the wheelarch flange tacked in place
ds23pallas: The wheelarch flange is nearly finished...
ds23pallas: Rear panel repairs
ds23pallas: Rear left bumper mount before repair