Dorset Council: The ferry berth just before the main works began in December 2012
Dorset Council: Diggers excavate the quayside
Dorset Council: Huge tubes of steel called piles were brought in
Dorset Council: These piles were driven into the quayside to form the foundations of the new wall
Dorset Council: After the piles were installed the box they created was filled with quarry material
Dorset Council: A concrete capping beam was buily, and fenders were installed for the ferry to moor up against
Dorset Council: The quayside was then surfaced with tarmac and ready for the return of Condor Ferries