Massachusetts Division of Ecological Restoration:
Satucket River Restoration before dam removal
Massachusetts Division of Ecological Restoration:
Satucket River, After Dam Removal
Massachusetts Division of Ecological Restoration:
Rattlesnake Brook adding habitat enhancements with the Youth Conservation Corps, Trustees of Reservations, and City of Fall River
Massachusetts Division of Ecological Restoration:
Crane lifts excavator into the Shawsheen River to complete removal of Balmoral Dam
Massachusetts Division of Ecological Restoration:
Balmoral Dam removal, Shawsheen River, Andover, MA
Massachusetts Division of Ecological Restoration:
After Balmoral Dam removed
Massachusetts Division of Ecological Restoration:
Bacteria Monitoring in Westfield
Massachusetts Division of Ecological Restoration:
Whittenton Groundbreaking July 2013
Massachusetts Division of Ecological Restoration:
Willow growth downstream former Whittenton Dam
Massachusetts Division of Ecological Restoration:
DER Staff Alex Hackman collects sediment for sampling, Nissitissit River
Massachusetts Division of Ecological Restoration:
Bartlett Pond Dam on Wekepeke Brook Prior to Removal
Massachusetts Division of Ecological Restoration:
After Bartlett Pond Dam removal
Massachusetts Division of Ecological Restoration:
Surveying Perched Culvert in Ashfield Massachusetts
Massachusetts Division of Ecological Restoration:
Muddy Creek Restoration in progress
Massachusetts Division of Ecological Restoration:
Muddy Creek after restoration
Massachusetts Division of Ecological Restoration:
Sediment Sampling Armstrong Dam (a.k.a Hollingsworth Dam) with MA DMF
Massachusetts Division of Ecological Restoration:
Kinne Brook dam
Massachusetts Division of Ecological Restoration:
Kinne Brook After Dam Removal, Chester, MA
Massachusetts Division of Ecological Restoration:
DER leads training on how to perform a survey of a road-stream crossing with MassWildlife
Massachusetts Division of Ecological Restoration:
Hoosic River. The chute topped with barbed wire and Mt Greylock in the distances-the state’s highest peak and a State Park
Massachusetts Division of Ecological Restoration:
Monitoring in the Westfield River
Massachusetts Division of Ecological Restoration:
Removal of the 8.4 foot tall Off Billington Street Dam on Town Brook, Plymouth, MA
Massachusetts Division of Ecological Restoration:
Summer after Off Billington Dam Removal, Town Brook Restoration, Plymouth, MA
Massachusetts Division of Ecological Restoration:
Snow Doesn't Stop Us DER Staff download stream flow data
Massachusetts Division of Ecological Restoration:
Sackett Brook Restoration
Massachusetts Division of Ecological Restoration:
A view of Sackett Brook looking upstream through the (former) dam site.
Massachusetts Division of Ecological Restoration:
DER leads a training on assessing culverts
Massachusetts Division of Ecological Restoration:
Spicket Restoration Scarito Park
Massachusetts Division of Ecological Restoration:
Granite Stone Steps for Water Access Spicket River Restoration
Massachusetts Division of Ecological Restoration:
DER leads a Road-Stream Crossing Training