David P Best:
PM935 as delivered
David P Best:
After uncrating and clean-up
David P Best:
PM-935TS Critical Dimensions
David P Best:
Visio-PM935 DRO and CAD drawings.vsd
David P Best:
PM-935 Mill Leveling Platform
David P Best:
PM-935 Mill Leveling Platform
David P Best:
PM-935 Mill Leveling Platform
David P Best:
Fabricating leveling feet base
David P Best:
Mill scale removed, corners eased
David P Best:
Drilling for feet and all-thread
David P Best:
Painting after drilling and prep
David P Best:
Leveling Feet Used
David P Best:
The leveing feet - 3/4" from McMaster
David P Best:
Hoisting off the shipping pallet
David P Best:
Leveling platform installed
David P Best:
Ready for lowering into basement
David P Best:
Coming down - look out below
David P Best:
Safely landed
David P Best:
Pallet jack for positioning in basement
David P Best:
Leveing system - brackets held on with all-thread
David P Best:
Another view - easy to level up
David P Best:
Room on the side for pallet jack
David P Best:
Drilling subfloor for landing pads
David P Best:
4" round aluminum blocks epoxied to concrete
David P Best:
In position - threaded studs need trimming
David P Best:
Close up
David P Best:
All trimmed out with acorn nuts - no caught pant legs here