davidm48: DREAMY Playa Hermosa on our first ever night in Costa Rica
davidm48: Temporary Construction shed
davidm48: Septic tank prep for the roof pour
davidm48: Boxing for the first three columns 6/2006
davidm48: Foam block install.
davidm48: Roof almost ready for Concrete Pour
davidm48: Prepping for the Roof and Beam Pour
davidm48: The mix
davidm48: Yes, I did too help.
davidm48: Strings represent level lines
davidm48: Most all of the fill was found closely