danreed121: AAN with ~125k miles on it
danreed121: blown head gasket around cylinder 4
danreed121: time to start bagging and labeling parts
danreed121: head was in good shape
danreed121: after the tear down day 1
danreed121: crank
danreed121: crank
danreed121: AAN Head
danreed121: AAN Head
danreed121: AAN Head
danreed121: SCAT Forged Rods
danreed121: Rods and Pistons
danreed121: Rods Swapped
danreed121: Crank Installed
danreed121: AAN Head
danreed121: Rods installed
danreed121: Crank with Rods
danreed121: AAN Block
danreed121: AAN Block set to TDC
danreed121: AAN Block with ARP studs and MLS gasket
danreed121: AAN Head
danreed121: AAN block and head
danreed121: billet crank cog
danreed121: Reference Pic
danreed121: Taking apart of the front
danreed121: Engine out
danreed121: Tired engine
danreed121: Old head, ready to remove EM and Turbo
danreed121: Fresh Engine