dan10things: Temporary walls on both levels of the Foster Library will dampen the noise during construction of the new entrance to the library
dan10things: This will be home of the new entrance to the library
dan10things: Most of Foster's second level and study rooms will be closed this summer during construction
dan10things: Prep work to connect BOAEEC and the Foster Library to the new PACCAR Hall's cooling system
dan10things: Tim and Amber at the Circ Desk with a big crane
dan10things: Life at Foster this summer