Crazy Rider:
original backyard
Crazy Rider:
original backyard
Crazy Rider:
harley getting ready to work with grandpa
Crazy Rider:
another use of recycle bin
Crazy Rider:
getting rid of the old barks around the house
Crazy Rider:
wild duck... he was there before we moved in
Crazy Rider:
DSCF7646
Crazy Rider:
old backyard getting revamped
Crazy Rider:
dad did a great job cleaning up all the old barks
Crazy Rider:
tunnels for railroad ties
Crazy Rider:
tunnels for railroad ties
Crazy Rider:
flowering squash
Crazy Rider:
green tomatos
Crazy Rider:
flowering squash
Crazy Rider:
green tomatos
Crazy Rider:
DSC_0011
Crazy Rider:
DSC_0012
Crazy Rider:
tools and dad's sandals
Crazy Rider:
4500 lbs of railroad ties
Crazy Rider:
4500 lbs of railroad ties
Crazy Rider:
4500 lbs of railroad ties
Crazy Rider:
dad digging tunnels again
Crazy Rider:
Moving and positioning them took a whole day
Crazy Rider:
they are damn heavy
Crazy Rider:
railroad tie mover
Crazy Rider:
Chain saw for cutting railroad ties
Crazy Rider:
mom, i think you should stay away
Crazy Rider:
it's nice to have TV out of Harley's reach
Crazy Rider:
Great, all railroad ties in position
Crazy Rider:
wondering harley