citizenstheatre:
The steel-work from Gorbals Street
citizenstheatre:
North of the site. Start of steel frame going up in front of the rehearsal room block with auditorium on right.
citizenstheatre:
Operators in MEWPS (Mobile elevated work platforms, or cherry pickers) work on the steel connections
citizenstheatre:
Mobile crane for lifting steel into position
citizenstheatre:
Operators work on steel connections
citizenstheatre:
Two centre columns for lift shaft
citizenstheatre:
Lift foundations
citizenstheatre:
Steel on site waiting to be assembled.
citizenstheatre:
The structure then progressed along the auditorium
citizenstheatre:
Steel built out across the gable wall
citizenstheatre:
Padstones being installed
citizenstheatre:
Steel frame steps out past the south face of the auditorium building.
citizenstheatre:
Steel frame extends out from auditorium to Gorbals Street.
citizenstheatre:
Steel being lifted up and into position at the other end of the building.
citizenstheatre:
Steel being lifted up and into position at the other end of the building.
citizenstheatre:
Steel lifted into position; Wall of workshop along Cleland Lane
citizenstheatre:
Construction of the steel continues
citizenstheatre:
Construction workshop with Cleland Lane on right
citizenstheatre:
Area containing the new studio theatre is constructed
citizenstheatre:
Steel craned in to the last area of the steel frame in the south-west corner
citizenstheatre:
Plinths ready for the statues.
citizenstheatre:
View from opposite the building
citizenstheatre:
View on to the corner of the building