ChrisDag:
delivery of lumber for the base/deck
ChrisDag:
the metal rod is epoxied into the concrete and the strong-tie hardware is nailed to the base of the 4x4 post. End result is easy to build yet strong base for stuff that does not need to be dug down below grade
ChrisDag:
This new chop saw was a christmas present I think for D- about two years ago. Came in handy as our old one would not have been able to cut a 4x6 beam.
ChrisDag:
We *think* typar vapor barrier under the 2in aspen deck planks will help keep the wood dry and.
ChrisDag:
Boss on deck. You can also see the 10ft "pole of truth" that we use to scribe the 20-diameter circle.