christopher_wood:
P5090073.jpg
christopher_wood:
Before we re-sized the back window. As much as we didn't want to reduce the window size we needed too in order to fit the counter under the window as well as make the area next to the window usable.
christopher_wood:
Resized window opening - waiting for new window. We had safety plastic for a few days.
christopher_wood:
Side window was also resized but we were able to salvage the existing window. The other half of this window is in the foreground of the image on the ground. Brick layer getting setup to start.
christopher_wood:
Window now installed - waiting on our very slow brick layer.
christopher_wood:
Side window complete waiting, again, on the brick layer to complete the back window.
christopher_wood:
Both windows now complete. New eves troughs as well. Don't look to closely not the best work.
christopher_wood:
New window installed with the roughed in electrical for when the new kitchen will be completed.
christopher_wood:
Me cutting dovetails and getting a saw dust shower in the process.
christopher_wood:
Drawers before they are glued and assembled.
christopher_wood:
Drawers.
christopher_wood:
More drawers - these need to be sanded.
christopher_wood:
Completed drawers.
christopher_wood:
Drawers installed in cabinets.
christopher_wood:
IMG_0882.jpg
christopher_wood:
IMG_0911.jpg
christopher_wood:
IMG_0914.jpg
christopher_wood:
End / side panels for the island
christopher_wood:
End panels for the cabinets. In front are the shelves.
christopher_wood:
Finally! Drawer fronts on 19 of the 50 drawers.
christopher_wood:
What I thought would be the last of the hardwood - I was wrong. This took me 4 hours to plane. From left to right - Walnut, Walnut, Maple and last Oak.
christopher_wood:
Doors, Drawer fronts and end panels. Lots and lots of sanding.
christopher_wood:
End panel of the island with the outlet and Doric Column installed.
christopher_wood:
Side panel to cover the side of the fridge - we included a magnetic whiteboard.
christopher_wood:
Pantry that goes next to the fridge. The side will be covered with a panel.
christopher_wood:
IMG_1415.jpg
christopher_wood:
The first stained glass panel.
christopher_wood:
Monogrammed kitchen cabinets
christopher_wood:
A room full of completed drawers.
christopher_wood:
Removing the old tiles.