Brook Reams:
Handlebar Switch Removed From Headlight Shell
Brook Reams:
Motion Pro Nitro Tape
Brook Reams:
Liquid Tape
Brook Reams:
60/40 Rosin Core Electric Wire Solder
Brook Reams:
16 Gauge Stranded Wire
Brook Reams:
200/260 Watt Soldering Gun
Brook Reams:
Wire Strippers
Brook Reams:
Wiring Connector Board Sections
Brook Reams:
GREEN-Blue Wires Connected Together But Not On Wiring Block
Brook Reams:
Two GREEN Wires Connect But Not On Wiring Block
Brook Reams:
Location Of Two Of The Right Handlebar Switch Wires On The Connector Board
Brook Reams:
Stripped Outer Sheath
Brook Reams:
Cutting Wire Extension-5.5 Inches
Brook Reams:
Stripped Wire End
Brook Reams:
Wires Cut At Different Locations To Keep Splices From Stacking On Top Of Each Other
Brook Reams:
Wires Are Butt Spliced
Brook Reams:
Larger Shrink Tubing
Brook Reams:
New Grommet Installed
Brook Reams:
Shrink Tubing Installed
Brook Reams:
First Splice Soldered and Shrink Tubing In Place
Brook Reams:
Splices Completed
Brook Reams:
Outer Shrink Tubing Installed
Brook Reams:
Nitro Tape Wrapped Splice
Brook Reams:
Liquid Tape Applied To New Left Grommet
Brook Reams:
Liquid Tape Applied To New Left Grommet
Brook Reams:
Left Side Grommet Is Shot
Brook Reams:
All Done