James0806: CMRC 1111
James0806: Putting the Pilings into Place
James0806: Driving the Pilings into the floor of the cove
James0806: Eight Pilings Placed
James0806: End of day 1
James0806: Old pilings are pulled out of the water
James0806: Day 2 Framing
James0806: Bolting the frame
James0806: Day 3: Framing the lower level
James0806: Framing is done
James0806: Framing completely done
James0806: Decking on the Dock
James0806: Decking is complete
James0806: Finished Dock
James0806: Dock at High Tide
James0806: Men of Gooseberry Dock Builders