blairmc99: Before - networking equipment is installed in a server rack.
blairmc99: Before - networking equipment is installed in a server rack.
blairmc99: In transition!
blairmc99: Patch panels are on the new rack
blairmc99: Switches and Neat-Patches installed, ready for the patch cables!
blairmc99: After - networking equipment is in a network rack.
blairmc99: The back side - still have some work left to do on this.
blairmc99: After
blairmc99: After
blairmc99: After