Bill Grabin:
1st floor fire exit cut-through; ~800-990 lb concrete block
Bill Grabin:
new fire exits 1st and 2nd floor
Bill Grabin:
clearing asphalt
Bill Grabin:
prep for loading docks
Bill Grabin:
Craig working on new transformers outside boiler room. Crossfit passageway closed off
Bill Grabin:
converting one door to two, and excavating to dock height
Bill Grabin:
pouring footings
Bill Grabin:
pouring footings
Bill Grabin:
and excavating
Bill Grabin:
inside view of two in one
Bill Grabin:
Forms for 40' retaining walls
Bill Grabin:
New office entrance
Bill Grabin:
New electrical panels
Bill Grabin:
Partial backfill
Bill Grabin:
New Hallway to Conference Room
Bill Grabin:
Additional electrical panels
Bill Grabin:
Installing dock levelers and seals
Bill Grabin:
Welding the dock levelers
Bill Grabin:
secure windows
Bill Grabin:
The old overhead door departs
Bill Grabin:
Docks are done! except for Spring paving
Bill Grabin:
New Tenant incoming
Bill Grabin:
Sprinkler pipes finally depart
Bill Grabin:
Just the base coat, but looks pretty good
Bill Grabin:
Just the base coat, but looks pretty good