Mixmaster: Standard, ugly toilet (and a little bit broken)
Mixmaster: Original bathroom furniture
Mixmaster: Original bathroom wall colour
Mixmaster: High class carpentry
Mixmaster: Basics done
Mixmaster: Covering the wall
Mixmaster: The new light wall is up
Mixmaster: Installing floor heating cables
Mixmaster: Covering the cables
Mixmaster: Laying out the tiles
Mixmaster: Working with mosaic tiles
Mixmaster: Decorative "window" with glass mosaic tiles
Mixmaster: New tiles, new toilet
Mixmaster: New tiles and drain
Mixmaster: New tub in place with new wall "colour"
Mixmaster: The main frame is done
Mixmaster: Construction site
Mixmaster: Starting to get somewhere
Mixmaster: And voilá
Mixmaster: The bench is finally glued and screwed tight
Mixmaster: Cabinets are up and we've installed lights in them of course
Mixmaster: New sink is being tested
Mixmaster: Looking forward to the completion
Mixmaster: Frame for the tiled box which will work as a shelf for toothbrushes etc
Mixmaster: Laying a flexible tube for the electricity
Mixmaster: The "box" underneath the mirror has been closed and is ready to be tiled
Mixmaster: Automatic ventilation fan
Mixmaster: Spackling
Mixmaster: Our new steam cabinet/shower room
Mixmaster: Getting somewhere