Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
Changing Train: Next step connecting the track.
Triggerian:
removing the old points
Triggerian:
track removed ready for leveling and timbers
Triggerian:
setting out timbers for the points
Triggerian:
The switchblades in place
Triggerian:
The crossover in place
Triggerian:
Cutting the rail end to suit
Triggerian:
Steve gives a new meaning to the term sleepers
Triggerian:
Steve sets an example in his directrial dutys
Triggerian:
Who put that drain there!
Triggerian:
sleepers set in road 1
Triggerian:
The first set of points in position
Triggerian:
The pway take over road 1 of the new complex
Triggerian:
screwing down the switch rails
Triggerian:
screwing down the switch rails
Triggerian:
switch rails connected
Triggerian:
starting work on connecting rails to the pointwork
Triggerian:
rails connected to points
Triggerian:
tracks connected to the points