Ds S: Come Spring 2010 the liner was cracked and water was down!
Ds S: Replacement liner being installed
Ds S: Just snaps into the existing top rail
Ds S: P1230711
Ds S: P1230710
Ds S: All snapped in, just need some water
Ds S: Water tankers standing by
Ds S: First water, 26,000 gallon to go.
Ds S: 2 tankers at a time
Ds S: P1230718
Ds S: All full and pump running, still at 47 degrees!!!
Ds S: After running the heater for 2 days the water temp is 80 degrees and ready for the summer fun.
Ds S: P1230771
Ds S: P1230773
Ds S: P1230766
Ds S: P1230763
Ds S: P1230778
Ds S: P1230775
Ds S: P1230776