phil60007: 66726 & 69003 0D84 Barrow Hill L.I.P. to Peterborough, approaching Gosberton on the GN & GE Joint line 29.08.22
phil60007: 66796, 69002 & 69004 0Z69 Tonbridge to Doncaster, Hedgefield Hurn, Gosberton on the GN & GE Joint line 25.03.22
phil60007: 69001 & 66793 4N80 Tonbridge to York Thrall RHTT wagons, passing Spalding 03.01.24
phil60007: 69001 & 69002 6E20 Tonbridge to Peterborough engineers wagons , Peterborough 13.10.21
phil60007: 69001 3Q98 Doncaster to Whitemoor Network Rail weedkiller train approaching Gosberton on the GN & GE Joint line 20.03.24
phil60007: 69001 on the rear of 6E80 York to Whitemoor RHTT wagon move, Hedgefield Hurn, Gosberton on the GN & GE Joint line, 16.09.22
phil60007: 69001, 66565 & 66522 6E30 Whitemoor to Doncaster engineers train, Spalding 15.04.24
phil60007: 69002 & 321334 5Z31 Doncaster Decoy to Long Marston, approaching Hurn Road 20.06.22
phil60007: 69002 6E85 Middleton Towers to Barnby Dun loaded sand approaching Spalding 22.04.24
phil60007: 69002 leads 3Q98 Toton to Skegness ( much needed ) weedkiller spray train, Sleaford 14.06.23
phil60007: 69003 & 69002 0E69 Tonbridge West to Peterborough, Peterborough station 30.05.22
phil60007: 69004 6E88 Middleton Towers to Goole Glassworks loaded sand, Werrington 08.05.24
phil60007: 69005 4E80 York to Whitemoor RHTT wagons, Glinton 08.09.22
phil60007: 69006 6E85 Middleton Towers to Barnby Dunn loaded sand passing Spalding 15.04.24
phil60007: 69007 6E85 Middleton Towers to Barnby Dun loaded sand passing Lincoln 29.04.24
phil60007: 69009, 379021 & 379026 5Q81 Worksop to Hornsey ECS, passing Marholm 08.05.24
phil60007: 69012 `Falcon -2`, 6E85 Middleton Towers to Banby Dun loaded sand approaching Spalding 16.09.24
phil60007: 69011 6E86 Middleton Towers to Monk Bretton loaded sand approaching Spalding 19.09.24