bobbiker: Cut off the bottom end of the pump to the desired length. Here i took a 56 cm pump and cut off about 6 cm
bobbiker: I cut off all but the bottom cm or so of the pump from the plug, and chucked it up in my drill press. Then used a rasp and file to file off the bottom of the tube from the plug until it just fits in the tube.
bobbiker: Here is the bottom plug ready to go into the tube
bobbiker: Plug fits in the tube with just enough clearance for epoxy to work well. A slip fit. Epoxy it into the tube.
bobbiker: Now cut off equivalent amount of the plunger.
bobbiker: File off the end of the plunger square and smooth.
bobbiker: Cut off all but the bottom cm of the plunger tube and then file though it to release it from the plug.
bobbiker: Now ready for the plug to go into the plunger tube.
bobbiker: I staked it in using a center punch, supporting it on the curved surface on the back of my vise, just like it was assembled originally.
bobbiker: Pump assembled except for the handle and end.
bobbiker: Put it back on the bike now.