lautrerainey:
The first beam Jay prepared to replace the missing wall.
lautrerainey:
A closer look at the complex shaping
lautrerainey:
The second beam is in place.
lautrerainey:
The new beam from the green room.
lautrerainey:
This is no longer a laundry room.
lautrerainey:
The laundry demo begins
lautrerainey:
In the kitchen we are down to the exterior walls.
lautrerainey:
Another spot on the front wall
lautrerainey:
The last of the backsplash tile is off the walls.
lautrerainey:
Only the sink and dishwasher left!
lautrerainey:
The opening for the new fridge
lautrerainey:
The pocket door is in.
lautrerainey:
Here's the pocket door on the kitchen side.
lautrerainey:
Our potty's gone!
lautrerainey:
The beautiful newly sanded floor in the kitchen.
lautrerainey:
Another shot of the solartube.
lautrerainey:
Two smaller solartubes bring a ton of
lautrerainey:
A pattern is stained into the new floor.
lautrerainey:
Here you can see the elaborate taping
lautrerainey:
Here's one design segment.
lautrerainey:
In the pantry the walls are drywalled again.
lautrerainey:
The other wall of the pantry is
lautrerainey:
My beautiful new floor is being sealed.
lautrerainey:
A view of the floor from the green room.