Gordon Ewen: Second fit check
Gordon Ewen: All cut and ready to glue
Gordon Ewen: Gluing the 2 font panels
Gordon Ewen: Bracing panels routed and rounded edges
Gordon Ewen: Speaker 2
Gordon Ewen: Speaker 1
Gordon Ewen: Cut panels first check on fit.
Gordon Ewen: First 4 panels glued together
Gordon Ewen: Front panels in primer
Gordon Ewen: Testing the driver fit
Gordon Ewen: Dealing with the imperfections on mdf edges
Gordon Ewen: Speaker one with second coat of sealer
Gordon Ewen: P1030761
Gordon Ewen: First look at what it will look like
Gordon Ewen: Speaker 2 ready for side panel to glued on
Gordon Ewen: Top, bottom and mid panels glued in place
Gordon Ewen: Front panels in primer
Gordon Ewen: First 4 panels glued together
Gordon Ewen: P1030758
Gordon Ewen: Speaker 2 side being glued in place
Gordon Ewen: Maple veneer
Gordon Ewen: Sp 1 top, and front edges, veneered
Gordon Ewen: Bitumen damping sheets installed
Gordon Ewen: Speaker 1 fully veneered and fillets gluEd in
Gordon Ewen: Sealer applied and sanded-1
Gordon Ewen: Spraying with lacquer-2
Gordon Ewen: SBA 3WC Speaker 1, finished!
Gordon Ewen: SBA 3WC and Illuminator 4
Gordon Ewen: SBA 3WC
Gordon Ewen: SBA 3WC v2