Gordon Ewen:
Veneering the sides.
Gordon Ewen:
Preparation
Gordon Ewen:
More prep
Gordon Ewen:
Veneered side panels
Gordon Ewen:
Gluning the side on the cabinet.
Gordon Ewen:
Front panel prep
Gordon Ewen:
Gluing the front apnels.
Gordon Ewen:
Gluing the bracing.
Gordon Ewen:
Veneering the bottom.
Gordon Ewen:
Tweeter crossover and felt installed
Gordon Ewen:
Gluing the front on to the cabinet.
Gordon Ewen:
Veneering completed.
Gordon Ewen:
Matched veneer on backs.
Gordon Ewen:
Matched veneers on sides.
Gordon Ewen:
Fronts veneer matched.
Gordon Ewen:
Cellulose sanding sealer applied.
Gordon Ewen:
Polished to 2500 grit.
Gordon Ewen:
Polished to 2500 grit 2
Gordon Ewen:
Finished 4
Gordon Ewen:
Finished 3
Gordon Ewen:
Finished 2
Gordon Ewen:
Finished.
Gordon Ewen:
Polished to 3800 grit and finished!
Gordon Ewen:
SBA 61NAC