Robbins TBM: Mangla Dam, Pakistan, 1964
Robbins TBM: The English Channel
Robbins TBM: A Beautiful Bore
Robbins TBM: Karahnjukar Breakthrough
Robbins TBM: East Side Access Conveyor
Robbins TBM: Niagra
Robbins TBM: Crew celebrate the cutterhead turning of a 10 m Double Shield TBM for Turkey’s Kargi Hydroelectric Project. The difficult ground encountered there was the inspiration for Robbins’ current line of Crossover TBMs.
Robbins TBM: A 7.0 m Robbins Double Shield is built on location using Onsite First Time Assembly (OFTA) for Lorain, Ohio, USA’s Black River Tunnel in 2013.
Robbins TBM: Overcoming the Odds at AMR
Robbins TBM: Workers and Robbins personnel celebrate the breakthrough of a Robbins Main Beam TBM at the Mumbai Water Tunnel in 2014. The speedy machine set national records in India for boring 870 m in one month and 58 m in one day.
Robbins TBM: The Crossover (XRE) TBM for Mexico City’s Túnel Emisor Poniente II (TEP II) was launched in 2015 following Onsite First Time Assembly (OFTA).