b&r_ramirez: Day 1/Ram Fam Cabin - 05.23.10
b&r_ramirez: Day 2/Ready for Concrete - 05.23.10
b&r_ramirez: Day 2/Ram Fam Cabin
b&r_ramirez: Day 5/ready for foundation inspection b/f pour/05.28.10
b&r_ramirez: Cabin progress/06.03.10
b&r_ramirez: Ram Fam Cabin/06.03.10
b&r_ramirez: Pile of lumber today, cabin next week 06.03.10
b&r_ramirez: Hope the relocated trees make it/06.03.10
b&r_ramirez: Footings for covered deck/06.03.10
b&r_ramirez: Cabin floor/06.04.10
b&r_ramirez: 06.09.10
b&r_ramirez: 06.10.10
b&r_ramirez: 06.10.10, our contractor sent this photo at 9:30pm
b&r_ramirez: 06.11.10
b&r_ramirez: 06.11.10
b&r_ramirez: Soon to be stoop
b&r_ramirez: front window layout.
b&r_ramirez: the Church loft
b&r_ramirez: first fire pit!
b&r_ramirez: The Church loft. We installed this cross so that JC will always be looking over us.
b&r_ramirez: MONEY CREEK RD.
b&r_ramirez: 06.14.10/West Facing
b&r_ramirez: 06.14.10/Dormer in the Loft
b&r_ramirez: 06.14.10/Back of the house
b&r_ramirez: 06.14.10/Front cabin
b&r_ramirez: 06.16.10/joists for covered porch
b&r_ramirez: 06.17.10/covered porch
b&r_ramirez: 06.19.10
b&r_ramirez: 06.24.10