TMurph51: BEFORE
TMurph51: Sample of the new railing.
TMurph51: Roof line where roof will be attached. The gutter is now down and and the new fascia will be installed next.
TMurph51: The posts stained
TMurph51: New wood stained and sealed.
TMurph51: Deck pressure washed and stained and old railing removed.
TMurph51: IMG_7414
TMurph51: IMG_7480
TMurph51: IMG_7469
TMurph51: IMG_7470
TMurph51: IMG_7479
TMurph51: IMG_7478
TMurph51: IMG_7476
TMurph51: IMG_7481
TMurph51: IMG_7483
TMurph51: IMG_7490
TMurph51: IMG_7492
TMurph51: IMG_7493
TMurph51: Fountain
TMurph51: New Deck railings