Phil's 1stPix:
Project in Progress: Open During Construction
Phil's 1stPix:
Finishing Touches: NEW Mystic Beach Layout
Phil's 1stPix:
Prime Beachfront Property: NEW Mystic Beach Layout
Phil's 1stPix:
Behind the Scenes 2013
Phil's 1stPix:
NEW Mystic Beach: Detached Shopping Center
Phil's 1stPix:
Welcome Back to Mystic Beach: S. Ocean Blvd. (2013)
Phil's 1stPix:
Mystic Beach Behind the Scenes: December 2013
Phil's 1stPix:
Open During Repairs
Phil's 1stPix:
Old Metro Trauma Center Diorama
Phil's 1stPix:
1st and 2nd level Old Mystic Beach Diorama Layout
Phil's 1stPix:
1stPix Old Diorama layout: 1st & 2nd Level aerial view
Phil's 1stPix:
Old Mystic Beach Diorama Layout
Phil's 1stPix:
Old Mystic Beach Diorama Level 1 & 2
Phil's 1stPix:
Mystic Beach "Old" Law Enforcement Show
Phil's 1stPix:
Highway Diorama Set-up 2009
Phil's 1stPix:
Desert Highway Up High
Phil's 1stPix:
2010 Desert Highway Layout
Phil's 1stPix:
FDMB HAZMAT Training Exercise
Phil's 1stPix:
NEW Highway Diorama "Behind the Scenes"
Phil's 1stPix:
2011 Highway Layout "Behind the Scenes"
Phil's 1stPix:
Painting Highway Lanes & Lines 101
Phil's 1stPix:
Country Road Layout "Behind the Scenes"
Phil's 1stPix:
Country Road Layout 2010
Phil's 1stPix:
NEW Tunnel Layout 4'X8' (Almost Finished) 2012
Phil's 1stPix:
NEW Bridge-Tunnel: "Behind the Scenes"
Phil's 1stPix:
NEW Mystic Beach: Under Construction
Phil's 1stPix:
Progress as Promised: NEW Mystic Beach Layout
Phil's 1stPix:
NEW Mystic Beach Diorama Layout: Under Construction
Phil's 1stPix:
Construction Delays Ahead
Phil's 1stPix:
NEW Beach Park Layout: Making Of (1 of 6)