Tulipo 2.1:
Snowy weather during demolition
Tulipo 2.1:
Kitchen clearance
Tulipo 2.1:
Kitchen clearance
Tulipo 2.1:
Work keeps going on, such as the laundry
Tulipo 2.1:
Showing the teeth
Tulipo 2.1:
35 shades of light blue
Tulipo 2.1:
Lots of nails in this old ceiling
Tulipo 2.1:
Scullery down, step 1
Tulipo 2.1:
In my street; 10 cubic metres of bricks
Tulipo 2.1:
Swap; 5 cubic metres of wood
Tulipo 2.1:
Another step
Tulipo 2.1:
Breaking through
Tulipo 2.1:
Demolition living floor
Tulipo 2.1:
Panorama patio
Tulipo 2.1:
Down in the cellar of my project
Tulipo 2.1:
Not Kiev, not Gaza, just a demolition of the nurses wing at my local hospital