a59rambler: DSCN3462, Wrning for motorist, Feb 2017
a59rambler: DSCN3468, IPD gets ready, Feb 2017
a59rambler: DSCN3473, Getting ready to clear the way, Feb 2017
a59rambler: DSCN3474, Checking for clearance, Feb 2017
a59rambler: DSCN3478, Getting ready, Feb 2017
a59rambler: DSCN3482, Working to move the signal, Feb 2017
a59rambler: DSCN3490, Using the cherry picker to push up the wires, Feb 2017
a59rambler: DSCN3498, The turbine arrives, Feb 2017
a59rambler: DSCN3501, Rig hauling the turbine, Feb 2017
a59rambler: DSCN3503, Front part of trailer, Feb 2017
a59rambler: DSCN3504, Big Kenworth, Feb 2017
a59rambler: DSCN3507, Two tractors pushing in the back, Feb 2017
a59rambler: DSCN3510, The turbine, Feb 2017
a59rambler: DSCN3513, Steering the trailer, Feb 2017
a59rambler: DSCN3515, Lifting the signals, Feb 2017
a59rambler: DSCN3516, Clearing the way, Feb 2017
a59rambler: DSCN3519, Moving crew, Feb 2017
a59rambler: DSCN3532, Squeaking under, Feb 2017
a59rambler: DSCN3536, Holding up the overhead wires, Feb 2017
a59rambler: DSCN3538, Close fit, Feb 2017
a59rambler: DSCN3543, Sneaks through, Feb 2017
a59rambler: DSCN3546, Making room, Feb 2017
a59rambler: DSCN3554, Swinging the signal out of the way, Feb 2017
a59rambler: DSCN3557, Moving the signal, Feb 2017
a59rambler: DSCN3565, Coming through, Feb 2017
a59rambler: DSCN3568, Loosening the signal arms, Feb 2017
a59rambler: DSCN3575, The turbine passes, Feb 2017
a59rambler: DSCN3580, Turbine moves through town, Feb 2017
a59rambler: DSCN3597, Turbine on Meadow St, Feb 2017