sdMcGizzle:
Demolition (future shower)
sdMcGizzle:
Demolition (future shower and tub)
sdMcGizzle:
IMG_2425 2
sdMcGizzle:
IMG_2428 2_2
sdMcGizzle:
rough-in of shower plumbing
sdMcGizzle:
IMG_2429 2
sdMcGizzle:
future toilet
sdMcGizzle:
granite slab
sdMcGizzle:
legs to vanities
sdMcGizzle:
joinery of legs for vanity
sdMcGizzle:
IMG_1802
sdMcGizzle:
IMG_1800
sdMcGizzle:
IMG_1799
sdMcGizzle:
IMG_1798
sdMcGizzle:
IMG_1801
sdMcGizzle:
IMG_1803
sdMcGizzle:
Flat steel from Home Depot that I heated, hammered, and darkened
sdMcGizzle:
Made my own dummy straps for cupboard doors hinges
sdMcGizzle:
I started with a shiny drawer pull from Home Depot
sdMcGizzle:
Then I heated, sanded, ground, etc.
sdMcGizzle:
then I distressed, hammered, and darkened to get my final drawer pull
sdMcGizzle:
finished vanities waiting to be installed
sdMcGizzle:
IMG_2302
sdMcGizzle:
IMG_2301
sdMcGizzle:
IMG_2293
sdMcGizzle:
IMG_2307
sdMcGizzle:
IMG_2313
sdMcGizzle:
IMG_2312
sdMcGizzle:
IMG_2315
sdMcGizzle:
IMG_2314