bokosphotos -:
52 Weeks of 2022 Week #18 B&W
bokosphotos -:
HMS Ocelot An Electrical Control Panel
bokosphotos -:
HMS Ocelot Engine Room
bokosphotos -:
HMS Gannet & The No3 Covered Slipway (The Big Space)
bokosphotos -:
Clock & Bell Tower on the Clocktower Building
bokosphotos -:
A capstan ready to take the rope
bokosphotos -:
1/4 of a mile to the other end from the far end
bokosphotos -:
Skeins of rope waiting to be twisted together
bokosphotos -:
Pulleys in the roof, these ropes goes from one end to the other
bokosphotos -:
B&W Towards the far end
bokosphotos -:
B&W Rope
bokosphotos -:
More Samples of rope
bokosphotos -:
Samples of rope
bokosphotos -:
Capstan for rope
bokosphotos -:
Strange machine through a big cast ring
bokosphotos -:
Sepia Towards the far end 1/4 of a mile away
bokosphotos -:
The Business End Of HMS Cavalier (1944)
bokosphotos -:
National Destroyer Memorial Incredible Detail (4)
bokosphotos -:
This Monument was Unveiled by HRH The Duke Of Edinburgh
bokosphotos -:
National Destroyer Memorial Incredible Detail (3)
bokosphotos -:
National Destroyer Memorial Incredible Detail (2)
bokosphotos -:
The National Destroyer Memorial at Chatham Dockyard (1)
bokosphotos -:
The Business End Of HMS Gannet (1878)
bokosphotos -:
The Business End Of HMS Submarine Ocelot (1962)